A custom kit proof is the visual mock-up of your design that you check and approve before anything is made. At DTR, nothing goes to production without your sign-off, so the proof is the moment your club or team gets the final say on logos, colours, names and layout. This guide covers what to check, who should approve it and how to keep a committee from slowing things down.
What is a custom kit proof?
A proof is a rendering of your artwork placed on the garments you have ordered, so you can see where each logo, stripe and name will sit before the fabric is printed. It turns a brief into something you can judge. If you are still preparing artwork, our guide to what we need to start your design comes first, and the custom apparel page is where you tell us your brief.
What should you check on a proof?
Check four things: that every logo and name is spelled and positioned correctly, that colours and contrast look right, that the layout works on each garment in the order, and that the sizing list matches your riders. Read it twice, once for the design and once as proofreading. Proofs show colour on a screen, so if a sponsor colour is critical, raise it early; sponsor colour matching explains how.
Where should logos sit?
Logos should sit where they stay visible when the rider is in position and where seams or pockets do not cut them. The proof is the place to catch a logo that falls across a seam. Our guide to sponsor logo placement on cycling kit lists the usual positions on a jersey and bib shorts.
Who should approve the proof?
One named person should give the final sign-off, after the rest of the committee has had a short, fixed window to comment. Proofs stall when five people each send separate corrections. Collect feedback into one list and send it together. For a wider view of running the process, read how to run a club kit order.
What happens after you sign off?
Production starts, so treat sign-off as final. That is why the proof is the right place to double-check sizes as well as design; the club sizing guide covers how to collect them. For the full sequence from proof to delivery, see the custom kit order timeline. Typical turnaround is 6 to 8 weeks.
Can you change something after approval?
Assume you cannot. Once a design is approved and in production, changes are not something to rely on, which is why a calm final check beats a rushed approval. If you are a club planning an order, the custom kit for cycling clubs guide shows where the proof fits in the whole process.
Custom kit proofs: quick answers
How long should a committee take to approve a proof?
Set a fixed window, such as a few days, and name one person to give final approval. Open-ended feedback is the main cause of delay.
What if the colours on the proof look different on my screen?
Screens vary, so if a colour is critical, tell us before approval so we can discuss it with you.
Do I need a minimum order to get a proof?
Custom orders start from 5 to 10 pieces, and every order goes through the same sign-off step.
Tell us your brief at the DTR custom apparel page and we'll take it from there.
DTR — performance cycling and triathlon apparel, designed and developed in Ukraine.









Leave a comment
This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.